Proceedings of the 11th Joint Conference on Information Sciences (JCIS 2008)

Key Risk Factors Assessment for Metropolitan Underground Project

Authors
Shih-Tong Lu1, Cheng-Wei Lin2, Hsin-Lung Liu3
1Department of Risk Management, Kainan University
2Department of Logistics and Shipping Management
3Department of Civil Engineering, Minghsin University of Science & Technology
Corresponding Author
Shih-Tong Lu
Available Online December 2008.
DOI
10.2991/jcis.2008.6How to use a DOI?
Keywords
Underground construction project, Risk factors analysis, Fuzzy preference relations
Abstract

Underground construction project in metropolis is more dynamic and risky. A key risk factors analysis will give project contractor a more rational basis on which to make decision. This study applies the fuzzy preference relations to deal with the degree of impact and rank for the main risk factors of a metropolitan underground project.

Copyright
© 2008, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 11th Joint Conference on Information Sciences (JCIS 2008)
Series
Advances in Intelligent Systems Research
Publication Date
December 2008
ISBN
978-90-78677-18-5
ISSN
1951-6851
DOI
10.2991/jcis.2008.6How to use a DOI?
Copyright
© 2008, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Shih-Tong Lu
AU  - Cheng-Wei Lin
AU  - Hsin-Lung Liu
PY  - 2008/12
DA  - 2008/12
TI  - Key Risk Factors Assessment for Metropolitan Underground Project
BT  - Proceedings of the 11th Joint Conference on Information Sciences (JCIS 2008)
PB  - Atlantis Press
SP  - 35
EP  - 41
SN  - 1951-6851
UR  - https://doi.org/10.2991/jcis.2008.6
DO  - 10.2991/jcis.2008.6
ID  - Lu2008/12
ER  -