The Technique and Management of Investment Control in Metro Engineering

Authors
Shunmao Mao, Tingting Zhu
Corresponding Author
Shunmao Mao
Available Online March 2015.
DOI
10.2991/itoec-15.2015.43How to use a DOI?
Keywords
Metro Engineering; Investment Control; Investment Management
Abstract

Metro engineering is a systematic engineering with a wide range, great investment, long construction cycle, and complex circuit. If improper handled, most likely engendering the investment exceeds budget estimate, thus affecting the economic and social benefits of projects. Throughout the development of metro engineering in decades, we have well-developed experience of construction and project management, but the old traditional pattern by administrative means has been still followed, not form a system, so it brings great limitations to the entire management process. Therefore, combined with the management mode of construction projects in our country, the article focuses on clearing the basic principle of the investment in metro engineering, pay attention to related technical details of investment control in process of the investment, particularly in design phase. With the help of efficiently and scientifically management, putting the course of investment management in place, so as to achieve general goal of infrastructure engineering construction with economical investment, fast progress, and preferable benefit.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 Information Technology and Mechatronics Engineering Conference
Series
Advances in Computer Science Research
Publication Date
March 2015
ISBN
978-94-62520-52-3
ISSN
2352-538X
DOI
10.2991/itoec-15.2015.43How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Shunmao Mao
AU  - Tingting Zhu
PY  - 2015/03
DA  - 2015/03
TI  - The Technique and Management of Investment Control in Metro Engineering
BT  - Proceedings of the 2015 Information Technology and Mechatronics Engineering Conference
PB  - Atlantis Press
SP  - 207
EP  - 211
SN  - 2352-538X
UR  - https://doi.org/10.2991/itoec-15.2015.43
DO  - 10.2991/itoec-15.2015.43
ID  - Mao2015/03
ER  -