The Technique and Management of Investment Control in Metro Engineering
- DOI
- 10.2991/itoec-15.2015.43How to use a DOI?
- Keywords
- Metro Engineering; Investment Control; Investment Management
- Abstract
Metro engineering is a systematic engineering with a wide range, great investment, long construction cycle, and complex circuit. If improper handled, most likely engendering the investment exceeds budget estimate, thus affecting the economic and social benefits of projects. Throughout the development of metro engineering in decades, we have well-developed experience of construction and project management, but the old traditional pattern by administrative means has been still followed, not form a system, so it brings great limitations to the entire management process. Therefore, combined with the management mode of construction projects in our country, the article focuses on clearing the basic principle of the investment in metro engineering, pay attention to related technical details of investment control in process of the investment, particularly in design phase. With the help of efficiently and scientifically management, putting the course of investment management in place, so as to achieve general goal of infrastructure engineering construction with economical investment, fast progress, and preferable benefit.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Shunmao Mao AU - Tingting Zhu PY - 2015/03 DA - 2015/03 TI - The Technique and Management of Investment Control in Metro Engineering BT - Proceedings of the 2015 Information Technology and Mechatronics Engineering Conference PB - Atlantis Press SP - 207 EP - 211 SN - 2352-538X UR - https://doi.org/10.2991/itoec-15.2015.43 DO - 10.2991/itoec-15.2015.43 ID - Mao2015/03 ER -