Dynamic Management and Schedule Risk in Rail Transit Projects based on 4D-BIM
Authors
Lina Liu, Hua Zheng, Yi Zhang
Corresponding Author
Lina Liu
Available Online November 2015.
- DOI
- 10.2991/itms-15.2015.329How to use a DOI?
- Keywords
- BIM; 4D-CAD; Rail Transit; schedule risk early warning
- Abstract
Rail transit project is system engineering with long construction period which involves different specialties and numerous departments. Project management and schedule control have a great impact on economic interests and social benefits. In this paper, project management model with comprehensive application of 4D-CAD and BIM technology is set for 4D-BIM rail transit project. Then, the risk early-warning model is proposed which is built on visual dynamic and integrating project management model. These provide a new method to improve management level and progress controlling ability of rail transit project.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Lina Liu AU - Hua Zheng AU - Yi Zhang PY - 2015/11 DA - 2015/11 TI - Dynamic Management and Schedule Risk in Rail Transit Projects based on 4D-BIM BT - Proceedings of the 2015 International Conference on Industrial Technology and Management Science PB - Atlantis Press SP - 1344 EP - 1347 SN - 2352-538X UR - https://doi.org/10.2991/itms-15.2015.329 DO - 10.2991/itms-15.2015.329 ID - Liu2015/11 ER -