Research on Complete Rail-less Construction Technology for Longitudinal Incline Shafts in Extra-long Tunnels
Corresponding Author
Bai Shangben
Available Online 28 September 2024.
- DOI
- 10.2991/978-94-6463-514-0_37How to use a DOI?
- Keywords
- longitudinal incline shafts; rail-less construction technology; comprehensive crawler machinery solution
- Abstract
Leveraging the case study of the Daba Mountain Tunnel project within the AL-C20 section of the Anlan Expressway, this paper investigates, selects, and validates various technologies suitable for the construction of longitudinal incline shafts. It assesses the merits and demerits of these technologies across dimensions such as efficiency, duration, safety, and economy. Ultimately, it adopts a comprehensive trackless construction approach utilizing crawler machinery, offering vital guidance for rail-less construction of longitudinal incline shafts in extra-long tunnels.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Chang Chunhui AU - Tian Wanliang AU - Chen Qiang AU - Bai Shangben PY - 2024 DA - 2024/09/28 TI - Research on Complete Rail-less Construction Technology for Longitudinal Incline Shafts in Extra-long Tunnels BT - Proceedings of the 2024 7th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA 2024) PB - Atlantis Press SP - 358 EP - 377 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-514-0_37 DO - 10.2991/978-94-6463-514-0_37 ID - Chunhui2024 ER -