Analysis of Lining Damage and Verification of Control Measures Based on Two-Stage Analysis Method
- DOI
- 10.2991/978-94-6463-514-0_16How to use a DOI?
- Keywords
- two-stage analysis method; Displacement superposition method; Segment damage; Slant support reinforcement
- Abstract
In order to determine the structural changes of the tunnel before and after the construction of the adjacent project, and to control the diseases within the specified range, based on the deep foundation pit project around the Jiubao Metro in Hangzhou, the maximum displacement results of the typical cross-section tunnel before and after deep foundation pit excavation and reinforcement calculated in PLAXIS were extracted, and the joint bolts, steel mesh, etc. were considered in the model established by DIANA. The displacement superposition of the refined single ring lining model was carried out, Analyze the damage of tunnel lining structure through two-stage calculations and verify the effectiveness of reinforcement measures. The research results indicate that the structural damage of the tunnel is more severe after deep excavation, and the reinforcement measures have a good control effect on the deformation of the tunnel. The two-stage refined model can quantify the lateral structural damage of the pipe segment and obtain the crack width to study the specific development trend of the pipe.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Xiang Ye AU - Fang He AU - Qingyuan Tan AU - Jinchang Wang AU - Yazhen Sun PY - 2024 DA - 2024/09/28 TI - Analysis of Lining Damage and Verification of Control Measures Based on Two-Stage Analysis Method BT - Proceedings of the 2024 7th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA 2024) PB - Atlantis Press SP - 145 EP - 153 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-514-0_16 DO - 10.2991/978-94-6463-514-0_16 ID - Ye2024 ER -