Reconstruction and Extension Project of Wastewater Treatment Plant in Beijiang Area, Tianjin Port
- DOI
- 10.2991/ism3e-15.2015.107How to use a DOI?
- Abstract
The original East Pier wastewater treatment plant in Beijiang Area, Tianjin Port, was built in 1992 to treat the wastewater produced locally. As required by the environmental protection department and owners, the output quality after treatment should meet the first class-A standard in “Pollutant discharge standard for urban sewage treatment plant (GB/T18918-2002)”. Furthermore, water quality should meet the standards on city greening, road cleaning and fire water in “Urban sewage regeneration and utilization-water quality for multiple uses in city (GB/T18920-2002)” So the plant should be reconstructed and extended. Based on the analysis on the quantity of wastewater in Beijiang Area, the proper treatment processes were adopted. After this reconstruction and extension project, this waste water treatment plant can treat sewage about 1.4 million tons per year. Currently, annual quantity of water used for city greening and road cleaning in Beijiang Area, Tianjin Port is about 5,000,000 tons each year, which will be substituted by the water treated from this waste water treatment plant, so that this project helps to greatly save water and bring an excellent economic performance.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Guoyi Li PY - 2015/11 DA - 2015/11 TI - Reconstruction and Extension Project of Wastewater Treatment Plant in Beijiang Area, Tianjin Port BT - Proceedings of the 2015 International Symposium on Material, Energy and Environment Engineering PB - Atlantis Press SP - 450 EP - 453 SN - 2352-5401 UR - https://doi.org/10.2991/ism3e-15.2015.107 DO - 10.2991/ism3e-15.2015.107 ID - Li2015/11 ER -