Optimization of Automatic Power Monitoring and Control Method in HVDC Projects
- DOI
- 10.2991/ism3e-15.2015.61How to use a DOI?
- Abstract
The construction of UHVDC (ultra high voltage direct current) transmission integrates the regional power grids into a whole grid in China, which increase the importance of power grid stability. Automatic power control helps operation personnel reduce the burden of work, but it may also take the power control error risk. The paper briefly investigates an improved method to reduce manual input and the burden of monitoring work for automatic power control. The improved method is based on the Yunnan-Guangdong II 800Kv UHVDC transmission project station SCADA (supervisory control and data acquisition) system. It does well in the project performance and reduce the operator’s work burden effectively.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yanhong Shen AU - Rui Zhang AU - Haoran Huang AU - Guohui Rao PY - 2015/11 DA - 2015/11 TI - Optimization of Automatic Power Monitoring and Control Method in HVDC Projects BT - Proceedings of the 2015 International Symposium on Material, Energy and Environment Engineering PB - Atlantis Press SP - 249 EP - 251 SN - 2352-5401 UR - https://doi.org/10.2991/ism3e-15.2015.61 DO - 10.2991/ism3e-15.2015.61 ID - Shen2015/11 ER -