Research on Functional Design of Power Information and Communication Scheduling Intensive Support System
- DOI
- 10.2991/ipemec-15.2015.108How to use a DOI?
- Keywords
- Information and communication; Intensive scheduling; Support system;Centralized network management
- Abstract
In the process of comprehensive promoting the electric power enterprise information and communication provincial, city and county "integration, specialization, lean" construction, the scheduling "integrated" support system can't fully meet the needs of intensive development of information and communication scheduling. In order to improve the functions of provincial information and communication scheduling system, adjust and optimize the scheduling support system architecture, this paper presents a information and communication intensive scheduling support system which is based on"data acquisition layer, data management layer, business application layer" and many elaborate methods to realize intensive scheduling from aspects of the scheduling management, operation and maintenance management, visualization, centralized scheduling platform, centralized network management and support system. Finally, the paper conducts some functional optimization design about the support system to improve the efficiency and security of the information and communication network steadily.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Fangfang Dang AU - Huiping Meng AU - Shiwen Wang AU - You Sun PY - 2015/05 DA - 2015/05 TI - Research on Functional Design of Power Information and Communication Scheduling Intensive Support System BT - Proceedings of the 2015 International Power, Electronics and Materials Engineering Conference PB - Atlantis Press SP - 578 EP - 583 SN - 2352-5401 UR - https://doi.org/10.2991/ipemec-15.2015.108 DO - 10.2991/ipemec-15.2015.108 ID - Dang2015/05 ER -