A Research for special piers' adjustment of steel pipe pile position: A case of Penang second marine bridge
- DOI
- 10.2991/ifeesm-17.2018.153How to use a DOI?
- Keywords
- Steel Pipe Pile, Position Adjustment, Comparison Differences
- Abstract
The aim of this preliminary research is to study the precision of pile foundation position compared to its original designed location. Before the installation of steel pipe piles for this project, the subcontractor found that the present vessel and equipment could not fully satisfy the plan twist angle and inclination requirements as shown on the detailed design drawings. Adjustment to the twist angle was needed for individual piles in some pier locations. In connection to the pile positions after the adjustment, this research has compared the pile forced loads with that of the original layout, and found that the structural impact is very insignificant due to the change in twist angle. It is confirmed that the revised pile group layout is acceptable. The relevant detail design is still applicable and amendment is unnecessary. The recommendation of this research could be adopted for the similar huge marine structures which installed large diameter steel pipe piles.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Kang Huang PY - 2018/02 DA - 2018/02 TI - A Research for special piers' adjustment of steel pipe pile position: A case of Penang second marine bridge BT - Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017) PB - Atlantis Press SP - 812 EP - 817 SN - 2352-5401 UR - https://doi.org/10.2991/ifeesm-17.2018.153 DO - 10.2991/ifeesm-17.2018.153 ID - Huang2018/02 ER -