The Construction of the Orbit for CRTS Type Plate Without a Frantic Jumble
- DOI
- 10.2991/ifeesm-17.2018.31How to use a DOI?
- Keywords
- CRTS type without a frantic jumble of orbit, Construction technique Coarse aggregate, Mass control
- Abstract
Taking the railway track construction practice of ning,an intercity railway as an example. Emphatically discusses the CRTS type without a frantic jumble rail construction technical preparation, base plate, rail board shop coarse and fine adjustment, cement emulsified asphalt mortar filling layer perfusion and other key working procedure of the construction technology and construction technology. Summarizes the basic blending ratio of cement emulsified asphalt mortar, the process flow of cement emulsified asphalt mortar filling, the control means of key technology and quality control, and the method of quality testing. Hope to provide reference for similar project construction.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Hong Gan AU - Yizhen Yang PY - 2018/02 DA - 2018/02 TI - The Construction of the Orbit for CRTS Type Plate Without a Frantic Jumble BT - Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017) PB - Atlantis Press SP - 164 EP - 168 SN - 2352-5401 UR - https://doi.org/10.2991/ifeesm-17.2018.31 DO - 10.2991/ifeesm-17.2018.31 ID - Gan2018/02 ER -