Optimization Model of Balanced Resource Allocation in Construction Project Group
- DOI
- 10.2991/ifeesd-16.2016.202How to use a DOI?
- Keywords
- Optimization model; Balanced resource allocation; Construction project group
- Abstract
In construction project group, the construction process is numerous, the resources required are multifarious, the resources allocation is difficult, and it is easy to appear resource allocation imbalance within a certain period of time. To implement the balance allocation of resources among varied projects, the optimization allocation model of resource equilibrium in project group is established. In constraints, construction process in each project should obey logic order; supply quantity of each resource per day should be within its lower limit and upper limit scope. A heuristic algorithm is proposed to solve above model so as to realize the balanced allocation of resources. Through the analysis of examples in application, its validity is validated, and it will provide reference for practical resource imbalance problems in engineering project group.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Chunguang Chang AU - Minghao Qi AU - Ziwei Song PY - 2016/05 DA - 2016/05 TI - Optimization Model of Balanced Resource Allocation in Construction Project Group BT - Proceedings of the 2016 International Forum on Energy, Environment and Sustainable Development PB - Atlantis Press SP - 1122 EP - 1125 SN - 2352-5401 UR - https://doi.org/10.2991/ifeesd-16.2016.202 DO - 10.2991/ifeesd-16.2016.202 ID - Chang2016/05 ER -