An Improved Method of Vehicle Driving Cycle Construction: A Case Study of Beijing
- DOI
- 10.2991/ifeesd-16.2016.151How to use a DOI?
- Keywords
- Driving Cycle Development; Micro-trips; Principal Component Analysis; K-means Clustering Analysis
- Abstract
The traditional vehicle driving cycle construction method is to use a random method to choose the cycle segments, which is lack of reliability and accuracy. In order to solve the problems of the traditional construction method, an improved methodology for developing a representative driving cycle for Beijing city was proposed in this paper. The methodology included four parts: data acquisition, kinematic sequences division, candidate segments classification and final segments selection. In the process of candidate cycle selection, we adopted a method based on the minimum characteristic parameters deviation to choose the final segments to construct driving cycle. The results indicate that this method can further improves the representativeness of the resultant driving cycle.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Zhenpo Wang AU - Yang Li AU - Hao Luo AU - Xue Xue PY - 2016/05 DA - 2016/05 TI - An Improved Method of Vehicle Driving Cycle Construction: A Case Study of Beijing BT - Proceedings of the 2016 International Forum on Energy, Environment and Sustainable Development PB - Atlantis Press SP - 832 EP - 838 SN - 2352-5401 UR - https://doi.org/10.2991/ifeesd-16.2016.151 DO - 10.2991/ifeesd-16.2016.151 ID - Wang2016/05 ER -