Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method
Authors
Yihua Mao, Yaoyao Zhang
Corresponding Author
Yihua Mao
Available Online April 2017.
- DOI
- 10.2991/iemss-17.2017.110How to use a DOI?
- Keywords
- utility tunnel, PPP, risk evaluation, fuzzy comprehensive evaluation method.
- Abstract
In this paper, risks of the utility tunnel PPP project are identified through the literature research and expert interviews. Then fuzzy comprehensive evaluation method is used to establish the evaluation model, which quantifies the qualitative index and achieve the multi-faceted comprehensive evaluation of the project, so as to provide reference for the later academic research and practical activities.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yihua Mao AU - Yaoyao Zhang PY - 2017/04 DA - 2017/04 TI - Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method BT - Proceedings of the 2017 International Conference on Innovations in Economic Management and Social Science (IEMSS 2017) PB - Atlantis Press SP - 550 EP - 555 SN - 2352-5428 UR - https://doi.org/10.2991/iemss-17.2017.110 DO - 10.2991/iemss-17.2017.110 ID - Mao2017/04 ER -