Research on the Applications of Flip Mode Technology in High Bridge Pier Construction Project and Quality Control
Authors
Wang Feng, Lai Xiao, Wen Zhen
Corresponding Author
Wang Feng
Available Online September 2015.
- DOI
- 10.2991/iemb-15.2015.168How to use a DOI?
- Keywords
- Flip Mode Technology; High Bridge Pier Construction; Quality Control.
- Abstract
In this paper, we conduct research on the applications of flip mode technology in high bridge pier construction project and quality control. Double mode refers to the construction of the piers of the bridge with three template mutual disassembly, constantly improve pier height, use the crane cut large pieces of the template in the process to turn up, continuously casting continuously rise, turned up through such makes the circulation homework way rising piers. Our proposed approach performs well through the numerical simulation which will be meaningful and effective.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wang Feng AU - Lai Xiao AU - Wen Zhen PY - 2015/09 DA - 2015/09 TI - Research on the Applications of Flip Mode Technology in High Bridge Pier Construction Project and Quality Control BT - Proceedings of the 2015 Conference on Informatization in Education, Management and Business PB - Atlantis Press SP - 813 EP - 817 SN - 2352-5398 UR - https://doi.org/10.2991/iemb-15.2015.168 DO - 10.2991/iemb-15.2015.168 ID - Feng2015/09 ER -