Study on BIM Maturity Model of Power Industry Based on LWD and LOWA Operator
Corresponding Author
Li Bian
Available Online 4 September 2023.
- DOI
- 10.2991/978-94-6463-230-9_6How to use a DOI?
- Keywords
- BIM maturity; LWD operator; LOWA operator
- Abstract
The construction of domestic smart grid is accelerating, power companies pay more and more attention to the application ability of BIM technology, the three-dimensional forward design is increasingly promoted. And the owner needs a perfect evaluation model to evaluate the BIM maturity of participants, improving their BIM application capabilities. In this paper, the quantified and objective evaluation results are obtained based on LWD and LOWA operator.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Hong He AU - Zhewei Shen AU - Jianglin Wang AU - Wenxuan Qiao AU - Lei Wang AU - Zhengyi Li AU - Li Bian PY - 2023 DA - 2023/09/04 TI - Study on BIM Maturity Model of Power Industry Based on LWD and LOWA Operator BT - Proceedings of the 3rd International Conference on Internet, Education and Information Technology (IEIT 2023) PB - Atlantis Press SP - 34 EP - 42 SN - 2667-128X UR - https://doi.org/10.2991/978-94-6463-230-9_6 DO - 10.2991/978-94-6463-230-9_6 ID - He2023 ER -