Proceedings of the International Conference on Social Science 2019 (ICSS 2019)

Linear Programming Model for Production Planning of Cassava Crackers

Authors
Ika Anna, Sereza Febrian
Corresponding Author
Ika Anna
Available Online November 2019.
DOI
10.2991/icss-19.2019.144How to use a DOI?
Keywords
cassava crackers; linear programming; production planning; maximize profit
Abstract

Cassava crackers companies have limited availability of cassava and its availability is greatly influenced by the season. The lack of good production planning and fluctuating cracker product demand makes this company experience overproduction and also underproduction. good production planning is needed to determine the optimal amount of cassava cracker production. The objective of this study is determine the amount of cassava crackers produced in a period by developing the linear programming (LP) model. The developed LP model will maximize the total profit. The LP model has five constraints function which include raw material, man hours, machine hours, product sale and nonnegative constraint. Case studies are given for the model validation process. The results obtained indicate that the model is able to determine the optimal amount of cassava cracker production.

Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the International Conference on Social Science 2019 (ICSS 2019)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
November 2019
ISBN
978-94-6252-839-0
ISSN
2352-5398
DOI
10.2991/icss-19.2019.144How to use a DOI?
Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Ika Anna
AU  - Sereza Febrian
PY  - 2019/11
DA  - 2019/11
TI  - Linear Programming Model for Production Planning of Cassava Crackers
BT  - Proceedings of the International Conference on Social Science 2019 (ICSS 2019)
PB  - Atlantis Press
SP  - 491
EP  - 494
SN  - 2352-5398
UR  - https://doi.org/10.2991/icss-19.2019.144
DO  - 10.2991/icss-19.2019.144
ID  - Anna2019/11
ER  -