The Problems and Countermeasures of Construction Management of Water Conservancy Project

Authors
Guilong Jin, Wei Ma
Corresponding Author
Guilong Jin
Available Online December 2016.
DOI
10.2991/icseee-16.2016.157How to use a DOI?
Keywords
water conservancy project; construction management; safety management; quality issues; cost accounting
Abstract

The construction management of water conservancy project, with characteristics as wide range and multi-field, includes construction process management measures and completion inspection and acceptance management. There are a series of problems in the construction management of water conservancy project at the present stage, such as quality control and security administration; therefore, corresponding measures should be taken to solve the urgent problems. In the process of water conservancy project construction, the proprietor should supervise and monitor the contractor to establish and improve the system of safety management, formulate strict safety supervision system strengthen the contract management and quality management of water conservancy construction.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 5th International Conference on Sustainable Energy and Environment Engineering (ICSEEE 2016)
Series
Advances in Engineering Research
Publication Date
December 2016
ISBN
978-94-6252-278-7
ISSN
2352-5401
DOI
10.2991/icseee-16.2016.157How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Guilong Jin
AU  - Wei Ma
PY  - 2016/12
DA  - 2016/12
TI  - The Problems and Countermeasures of Construction Management of Water Conservancy Project
BT  - Proceedings of the 2016 5th International Conference on Sustainable Energy and Environment Engineering (ICSEEE 2016)
PB  - Atlantis Press
SP  - 881
EP  - 884
SN  - 2352-5401
UR  - https://doi.org/10.2991/icseee-16.2016.157
DO  - 10.2991/icseee-16.2016.157
ID  - Jin2016/12
ER  -