Preliminary Study on Analysis Technology of Normal Level Adjustment for Constructed Reservoir- Taking Hangzhou City Qingshan Reservoir as an Example
- DOI
- 10.2991/icseee-16.2016.9How to use a DOI?
- Keywords
- Qingshan reservoir; non-flood period; Normal level; Necessity; Feasibility; Probably of water supply; Probably of full level
- Abstract
To determine the normal water level is an essential part of new design process, only normal water level adjustment is the new things gradually in recent years. Reservoir is an important part for the development of social economy system, may affect the situation as a whole, and then normal water level adjustment analysis technology also has some particularity. Accumulation of relevant experience through the engineering case, perfect technology system, has reference value for the similar work. With the theories of hydrology and water resources, dam safety, sociology and the cost benefit theory, the Hangzhou City Qingshan reservoir normal water level adjustment analysis technology conducted a preliminary exploration, and a integrated analysis model of necessity analysis, water resources demand, runoff flow, feasibility, risk benefit and operation mode etc. of normal water level adjustment for constructed reservoir are put forward. Then normal water level adjustment analysis framework and technical route are creatively put forward, and successfully applied to Hangzhou City Qingshan reservoir normal water level analysis. After analysis, the necessity and feasibility of improving the normal water storage level of Qingshan reservoir have been met, and the increase of 2.0m to 25.16m can increase the storage capacity of 18 million 790 thousand cubic meters, which can be used as recommended program.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Quanfu Luo AU - Haijun Zheng AU - Shichen Zhang PY - 2016/12 DA - 2016/12 TI - Preliminary Study on Analysis Technology of Normal Level Adjustment for Constructed Reservoir- Taking Hangzhou City Qingshan Reservoir as an Example BT - Proceedings of the 2016 5th International Conference on Sustainable Energy and Environment Engineering (ICSEEE 2016) PB - Atlantis Press SP - 50 EP - 60 SN - 2352-5401 UR - https://doi.org/10.2991/icseee-16.2016.9 DO - 10.2991/icseee-16.2016.9 ID - Luo2016/12 ER -