Optimization of A2/O—MBR Integrated Process for High Standard of Reclaimed Water Quality in Beijing, China
- DOI
- 10.2991/icseee-15.2016.206How to use a DOI?
- Keywords
- Wastewater reclamation; A2/O process; Membrane bioreactor (MBR); Reclaimed water quality; Local standard of Beijing
- Abstract
The effectiveness of A2/O—MBR integrated process has been studied for domestic wastewater reclamation to meet the latest Beijing pollutant emission standards. Experimental results showed that high DO concentrations in the aerobic tank improved CODCr, NH3-N, and TP removals, whereas the TN removal increased initially and then decreased. Increasing the internal reflux ratio promoted the removal of TN, howbeit negligibly affected the removals of CODCr, NH3-N, and TP. The removals of CODCr, NH3-N, and TN rose with HRT, but the extent of rising became limited as HRT larger than 9 h. Membrane fouling rate increased with running time, and accelerated by improving membrane flux. When the system parameters are set at optimized conditions, i.e. the DO concentration of 2.0 mg/L, the internal reflux ratio of 250%, HRT of 9 h, and ozonation for 20 min, the major water quality of outlet remains stable and meets Grade A of Beijing local standards for new wastewater treatment plant (DB 11890-2012).
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Hao Wang AU - Ning Ma AU - Maosheng Ye AU - Cao Liu AU - Qingyi Meng AU - Qijun Li PY - 2016/04 DA - 2016/04 TI - Optimization of A2/O—MBR Integrated Process for High Standard of Reclaimed Water Quality in Beijing, China BT - Proceedings of the 2015 4th International Conference on Sustainable Energy and Environmental Engineering PB - Atlantis Press SP - 1158 EP - 1164 SN - 2352-5401 UR - https://doi.org/10.2991/icseee-15.2016.206 DO - 10.2991/icseee-15.2016.206 ID - Wang2016/04 ER -