General Study on the Construction and Installation of Jacket Skirt Pile Sleeve
- DOI
- 10.2991/icseee-15.2016.124How to use a DOI?
- Keywords
- Offshore Engineering, Jacket, Jacket skirt pile sleeve, Lift
- Abstract
As time enters 21st century, the world enters the era of oil scarcity, which is the so-called "post-oil era." Onshore exploration peak period has expired; the energy gap gradually expanded into the marine transfer is the trend. The main forms of offshore platforms are: jacket platforms, jack-up rigs, semi-submersible drilling platforms and floating vessels. Wherein the jacket fixed platform as the domestic and international manufacturing and plays an important role in the offshore oil and gas resource development. The skirt pile sleeve as one of the most important parts of the jacket, the study of its construction and installation has a very important significance. This article will detail the construction and installation of jacket skirt pile sleeve.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jicheng Shi AU - Xin Lian AU - Yiwen Wu AU - Jifei Shang AU - Yuji Shen PY - 2016/04 DA - 2016/04 TI - General Study on the Construction and Installation of Jacket Skirt Pile Sleeve BT - Proceedings of the 2015 4th International Conference on Sustainable Energy and Environmental Engineering PB - Atlantis Press SP - 721 EP - 726 SN - 2352-5401 UR - https://doi.org/10.2991/icseee-15.2016.124 DO - 10.2991/icseee-15.2016.124 ID - Shi2016/04 ER -