Construction and Lifting Technology for Column Subsection of Tension Leg Platform
Authors
Lixin Song
Corresponding Author
Lixin Song
Available Online April 2016.
- DOI
- 10.2991/icseee-15.2016.120How to use a DOI?
- Keywords
- tension leg platform, TLP, Column subsection, construction, lifting and assembly
- Abstract
Construction and lifting technology of column subsection is the key to build the lower hull of tension leg platform (TLP). Reasonable block dividing and build process could reduce the fabrication of dock workload, control welding distortion and dimensional accuracy and shorten the construction period. Optimization of lifting point design is advantageous safeguard for fabricating. This paper expounds the fabricating procedure and subsection lifting method of column subsection of the deep water tension leg platform, for TLP’s construction provide favorable support.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Lixin Song PY - 2016/04 DA - 2016/04 TI - Construction and Lifting Technology for Column Subsection of Tension Leg Platform BT - Proceedings of the 2015 4th International Conference on Sustainable Energy and Environmental Engineering PB - Atlantis Press SP - 696 EP - 701 SN - 2352-5401 UR - https://doi.org/10.2991/icseee-15.2016.120 DO - 10.2991/icseee-15.2016.120 ID - Song2016/04 ER -