Financial and Economic Feasibility Study of Tempel - Yogyakarta - Samas Urban Railway Line
- DOI
- 10.2991/978-94-6463-126-5_5How to use a DOI?
- Abstract
The government of the Special Region of. Yogyakarta proposed the development of the Tempel – Yogyakarta – Samas railway line. This study aimed to determine the financial and economic feasibility. Investment costs and income were calculated for the 50 years concession period from 2024 to 2073. The financial feasibility study was carried out with the parameters of Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and payback period. Subsequently, an economic feasibility study was performed with ENPV and EIRR parameters. A financial feasibility study of the Tempel – Samas railway lane was feasible under a scenario using the government’s support such as land acquisition, Viability Gap Fund (VGF) that consists of 40% of infrastructure cost, and train ticket subsidy. Economic feasibility indicators show the economic feasibility with ENPV IDR 25,616,108,257,312 and EIRR 15.85%.
- Copyright
- © 2023 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Aryadhatu Dhaniswara AU - Imam Muthohar AU - Dewanti PY - 2023 DA - 2023/03/31 TI - Financial and Economic Feasibility Study of Tempel - Yogyakarta - Samas Urban Railway Line BT - Proceedings of the International Conference on Railway and Transportation (ICORT 2022) PB - Atlantis Press SP - 39 EP - 47 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-126-5_5 DO - 10.2991/978-94-6463-126-5_5 ID - Dhaniswara2023 ER -