Proceedings of the International Conference on Railway and Transportation (ICORT 2022)

Pondok Rajeg Passenger Station Reactivation

Authors
David Malaiholo1, *, Septiana Widi1, Cahyadi Alliansi Qoyum1
1Indonesian Railway Polytechnic, Jalan Tirta Raya, Madiun, 63132, Indonesia
*Corresponding author. Email: david@ppi.ac.id
Corresponding Author
David Malaiholo
Available Online 31 March 2023.
DOI
10.2991/978-94-6463-126-5_28How to use a DOI?
Keywords
Reactivation; Station Class; Station Plan Area; Station Room Dimension
Abstract

The reactivation of Pondok Rajeg Station has an impact on reducing congestion in the Depok area. The initial stage of reactivation of Pondok Rajeg Station requires a redesign because the condition of the station is an inactive station that is not maintained. In the re-planning of passenger stations, directed planning is needed so that the stations can be used as comfortably as possible. The purpose of this study is to determine the class of Pondog Rajeg Station based on applicable regulations and determine the dimensions of the room at Pondog Rajeg Station. The method used for this research is to determine the needs of station facilities based on the station class from the station reactivation study data. This study found that the class criteria for Pondok Rajeg Station had a credit score of 45.5 and was declared a small station. The design of Pondok Rajeg Station based on PM 29 of 2011 is that Pondok Rajeg Station has a main activity building, a supporting station building, a special service building and a platform. The facilities provided based on PM 63 of 2019 are safety facilities, security facilities, regularity facilities, comfort facilities and equality facilities. Determination of the area of the Pondok Rajeg station is obtained by knowing the existing area of the station and planning for the addition of the platform and then getting the KDB value.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the International Conference on Railway and Transportation (ICORT 2022)
Series
Advances in Engineering Research
Publication Date
31 March 2023
ISBN
978-94-6463-126-5
ISSN
2352-5401
DOI
10.2991/978-94-6463-126-5_28How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - David Malaiholo
AU  - Septiana Widi
AU  - Cahyadi Alliansi Qoyum
PY  - 2023
DA  - 2023/03/31
TI  - Pondok Rajeg Passenger Station Reactivation
BT  - Proceedings of the International Conference on Railway and Transportation (ICORT 2022)
PB  - Atlantis Press
SP  - 268
EP  - 274
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-126-5_28
DO  - 10.2991/978-94-6463-126-5_28
ID  - Malaiholo2023
ER  -