Analysis of Delays in Housing Construction PT. Tata Building Facilities Using the Faul Tree Analysis Method
Corresponding Author
Vicky Maulana
Available Online 13 May 2024.
- DOI
- 10.2991/978-94-6463-406-8_18How to use a DOI?
- Keywords
- Housing; Construction; Delay Analysis
- Abstract
AnalysisDelay in Housing Development is an activity that aims to build a facility and infrastructure within the planned time provisions but in the implementation stage it cannot be completed within the agreed time, therefore the author conducts research using the Faul (Tree Analysis) FTA method which is used qualitatively has 2 (two) basic notation types: events and logic gates. Event notation consists of symbols, among others.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Vicky Maulana AU - Dini Apriliani AU - Darwan Susila AU - Rizky Ardiansyah PY - 2024 DA - 2024/05/13 TI - Analysis of Delays in Housing Construction PT. Tata Building Facilities Using the Faul Tree Analysis Method BT - Proceedings of the 2nd International Conference on Consumer Technology and Engineering Innovation (ICONTENTION 2023) PB - Atlantis Press SP - 98 EP - 102 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6463-406-8_18 DO - 10.2991/978-94-6463-406-8_18 ID - Maulana2024 ER -