Research on Risk Management of Aviation Complex Equipment Collaborative Development Project
- DOI
- 10.2991/icoeme-19.2019.129How to use a DOI?
- Keywords
- aviation complex equipment; risk management; milestone events
- Abstract
Firstly, this paper expounds the background of the risk management problem of aviation complex equipment collaborative development project, and points out the significance of studying this problem. Secondly, this paper analyzes the risk occurrence mechanism of aviation complex equipment collaborative development project, and introduces the milestone events and the relationship between events. In addition, based on the system optimal control theory and the risk transfer function, with the goal of minimizing risk loss and risk control cost, this paper constructs a risk optimization model for the aviation complex equipment collaborative development system, and solves the degree of risk optimization of the milestone events. Finally, the model is validated by an example, which proves the validity of the model and provides reference for the collaborative development of aviation complex equipment in the future.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xiaojuan Zhu AU - Yongbo Cheng PY - 2019/06 DA - 2019/06 TI - Research on Risk Management of Aviation Complex Equipment Collaborative Development Project BT - Proceedings of the 2nd International Conference on Economy, Management and Entrepreneurship (ICOEME 2019) PB - Atlantis Press SP - 691 EP - 696 SN - 2352-5428 UR - https://doi.org/10.2991/icoeme-19.2019.129 DO - 10.2991/icoeme-19.2019.129 ID - Zhu2019/06 ER -