The application of BIM technology in the construction of Hangzhou Zizhi tunnel

Authors
Jianwang Wang, Xiaosu Hao, Xiang Gao
Corresponding Author
Jianwang Wang
Available Online April 2015.
DOI
10.2991/icmra-15.2015.40How to use a DOI?
Keywords
BIM; Zizhi tunnel; model; construction application
Abstract

BIM technology has already got relatively extensive application in the field of domestic architecture, but it is rarely used in the tunnel engineering construction. To solve the problems such as the construction of car cross channel and tunnel subject structure, the construction process control of the whole tunnel project build, the optimization of special construction scheme and the accurate and rapid calculation of quantities, Hangzhou Zizhi tunnel engineering adopts BIM construction application system completed by engineering three-dimensional digitalization technology, and the creation of subject tunnel model including geologic model is completed, five major categories of application points are realized. Combined with three-dimensional geological tool GeoStation and three-dimensional reinforcement software ReStation, specific tunnel construction solution based on BIM application is formed, the innovation and effect in the construction process of Zizhi tunnel is realized, the application value and broad development prospects of BIM technology in the tunnel construction is embodied.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 3rd International Conference on Mechatronics, Robotics and Automation
Series
Advances in Computer Science Research
Publication Date
April 2015
ISBN
978-94-62520-76-9
ISSN
2352-538X
DOI
10.2991/icmra-15.2015.40How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jianwang Wang
AU  - Xiaosu Hao
AU  - Xiang Gao
PY  - 2015/04
DA  - 2015/04
TI  - The application of BIM technology in the construction of Hangzhou Zizhi tunnel
BT  - Proceedings of the 3rd International Conference on Mechatronics, Robotics and Automation
PB  - Atlantis Press
SP  - 195
EP  - 204
SN  - 2352-538X
UR  - https://doi.org/10.2991/icmra-15.2015.40
DO  - 10.2991/icmra-15.2015.40
ID  - Wang2015/04
ER  -