Proceedings of the 4th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering 2015

Construction Technology of Permeable Rib Double-Arch Tunnel

Authors
Ruijun Song, Fei Yu, Shanxiong Chen, Xiuhe Chen, Fei Wang
Corresponding Author
Ruijun Song
Available Online December 2015.
DOI
10.2991/icmmcce-15.2015.569How to use a DOI?
Keywords
permeable rib double-arch tunnel, tunnel adjacent to mountain, construction method; bias voltage, surrounding rock consolidation
Abstract

The permeable rib double-arch tunnel is a new type structure of tunnel adjacent to mountain, a better way to solve the problems of engineering stability and environmental protection of highway adjacent to mountain in mountains area. For the environmental geological problems of the tunnel adjacent to mountain with the thin layer and the significant biasing effect, a set of more suitable construction methods and techniques are put forward combining with the structural feature and the analysis of mechanics regularity to the special-shaped tunnel. With practical engineering, the construction technology of the permeable rib double-arch tunnel has a better effectiveness and reliability, which ensures the successful implementation of the new type of tunnel structure.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 4th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering 2015
Series
Advances in Computer Science Research
Publication Date
December 2015
ISBN
978-94-6252-133-9
ISSN
2352-538X
DOI
10.2991/icmmcce-15.2015.569How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Ruijun Song
AU  - Fei Yu
AU  - Shanxiong Chen
AU  - Xiuhe Chen
AU  - Fei Wang
PY  - 2015/12
DA  - 2015/12
TI  - Construction Technology of Permeable Rib Double-Arch Tunnel
BT  - Proceedings of the 4th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering 2015
PB  - Atlantis Press
SN  - 2352-538X
UR  - https://doi.org/10.2991/icmmcce-15.2015.569
DO  - 10.2991/icmmcce-15.2015.569
ID  - Song2015/12
ER  -