Integrated Optimization of Flexible Job Shop Scheduling Problem and Equipment Maintenance Plan
- DOI
- 10.2991/icmmcce-15.2015.233How to use a DOI?
- Keywords
- Flexible job shop; Shop Scheduling; Equipment Maintenance;
- Abstract
This paper researches the integrated optimization of flexible job shop scheduling problem (FJSP) and equipment maintenance plan. The object of the integrated optimization model is to pursue the minimum of makespan. The paper proposed a two-stage algorithm based on the genetic algorithm to solve the problem. Firstly generated basic FJSP schedules. Secondly when the reliability of the equipment is below the threshold value probabilistically arranged the unequal periodic equipment maintenance at the equipment’s free time. Then obtained an integrated plan. The optimization result of a practical example showed that the makespan of the integrated optimization was less than the makespan of equipment maintenance at regular intervals.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jing Zha AU - Hua Jin AU - Zhicheng Pan AU - Qingsong Yuan PY - 2015/12 DA - 2015/12 TI - Integrated Optimization of Flexible Job Shop Scheduling Problem and Equipment Maintenance Plan BT - Proceedings of the 4th International Conference on Mechatronics, Materials, Chemistry and Computer Engineering 2015 PB - Atlantis Press SN - 2352-538X UR - https://doi.org/10.2991/icmmcce-15.2015.233 DO - 10.2991/icmmcce-15.2015.233 ID - Zha2015/12 ER -