Determination of the process and parameters of the technology of high-speed railway screw pile technology
- DOI
- 10.2991/icmia-17.2017.50How to use a DOI?
- Keywords
- High-speed rail; Screw pile; Manufacturability; The test;
- Abstract
The high iron screw pile construction technique is a new technique, a kind of foundation reinforcement by representative districts to the manufacturability of pile test, the parameters determined by test pile construction, fixed in time according to the problems found during the process of test pile construction technology, determine the concrete proportions and physical properties of all kinds of materials; The bearing capacity of the single pile is in accordance with the foundation bearing capacity. The construction process and parameters are the basis for evaluation of the quality inspection of the project; To test the selected construction equipment and construction technology; Through the strength of pile body completeness, detection, to determine whether no lateral compressive strength can meet the design strength, to optimize the construction parameters and cement mortar, water cement ratio. Provide reference for the construction and experiment of screw piling for high-speed railway.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jun Gao PY - 2017/06 DA - 2017/06 TI - Determination of the process and parameters of the technology of high-speed railway screw pile technology BT - Proceedings of the 2017 6th International Conference on Measurement, Instrumentation and Automation (ICMIA 2017) PB - Atlantis Press SP - 270 EP - 275 SN - 1951-6851 UR - https://doi.org/10.2991/icmia-17.2017.50 DO - 10.2991/icmia-17.2017.50 ID - Gao2017/06 ER -