The Research of The 35KV optimization design and stable operation of technical for wind farm
Authors
Jingjing Zheng, Yong Yang, Jianhua Zhang, Peidong Du, Yongjun Han
Corresponding Author
Jingjing Zheng
Available Online August 2015.
- DOI
- 10.2991/icmeis-15.2015.17How to use a DOI?
- Keywords
- harmonic; ungrounded system; ferromagnetic resonance; identifying the line in a single phase to ground.
- Abstract
Large-scale accident which wind turbines are off the grid has happened in the base of Jiuquan wind farm. The majority of accidents are closely related to unreasonable operation technology and unreasonable run manner of 35kV system of wind farm, unreasonable selection of equipment.Study the wiring structure of the 35kV system of the wind power, the actual operation of the wind power, the restrict of technical means, reference current proven advanced technology, propose optimization from system design, equipment selection and run manner etc. Operation reliability of 35kV wind power system has been great increased.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jingjing Zheng AU - Yong Yang AU - Jianhua Zhang AU - Peidong Du AU - Yongjun Han PY - 2015/08 DA - 2015/08 TI - The Research of The 35KV optimization design and stable operation of technical for wind farm BT - Proceedings of the 3rd International Conference on Mechanical Engineering and Intelligent Systems (ICMEIS 2015) PB - Atlantis Press SP - 74 EP - 79 SN - 2352-5401 UR - https://doi.org/10.2991/icmeis-15.2015.17 DO - 10.2991/icmeis-15.2015.17 ID - Zheng2015/08 ER -