Research on the Parameters of Tailings Cemented Filling for Mined-out Open Pits
- DOI
- 10.2991/icmcm-16.2016.120How to use a DOI?
- Keywords
- Mined-out Open Pit; Filling Parameter; Orthogonal Experiment; Finite Element Analysis
- Abstract
Taking the treatment project of tailings cemented filling for mined-out open pits in typical metal mines as background, using theoretical analysis and numerical simulation research method, the cement-sand ratio and concentration of filling slurry, the total filling height, level height, stratification height and the methods to determine the structure parameter of cement-sand ratio at different stages were provided. And then through the calculation and analysis, it is concluded that the cement-sand ratios of filling slurry of mined-out open pits are classified into three different grades: 1:8, 1:10, 1:20; the slurry concentration is 70%; the filling height is 80m; the level height is 20m; the stratification height is 1.5m; the cement-sand ratios of filling slurry of four stages are 1:8, 1:8, 1:10, 1:20.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Liang Peng AU - Luhong Jian PY - 2016/12 DA - 2016/12 TI - Research on the Parameters of Tailings Cemented Filling for Mined-out Open Pits BT - Proceedings of the 2016 7th International Conference on Mechatronics, Control and Materials (ICMCM 2016) PB - Atlantis Press SP - 641 EP - 646 SN - 2352-5401 UR - https://doi.org/10.2991/icmcm-16.2016.120 DO - 10.2991/icmcm-16.2016.120 ID - Peng2016/12 ER -