Analysis of Work Load and Total Operator Needs on Final Inspection of Work Station
- DOI
- 10.2991/iclick-18.2019.61How to use a DOI?
- Keywords
- manpower; takt time; work measurement; yamazumi chart
- Abstract
This study aims to determine the number of ideal operators according to the company condition. This research uses work measurement method and analyzed by Yamazumi Chart. The research object is three selected operators from the final inspection work station. The study results concluded that, the new Takt time conditions for 120 seconds, then the company allocates 3 operators, the average work loading or it’s Manpower efficiency in that part is only 60 percent. But if the company allocates 2 operators only, the average work loading or man power efficiency reaches 90 percent. Based on the calculation according to the method used, then the operator needs in that part with the new Takt time conditions are 2 operators.
- Copyright
- © 2019, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Supriyadi Supriyadi AU - Herlam Siregar AU - Eko Hadi Sucipto PY - 2019/07 DA - 2019/07 TI - Analysis of Work Load and Total Operator Needs on Final Inspection of Work Station BT - Proceedings of the 1st International Conference on Life, Innovation, Change and Knowledge (ICLICK 2018) PB - Atlantis Press SP - 297 EP - 301 SN - 2352-5398 UR - https://doi.org/10.2991/iclick-18.2019.61 DO - 10.2991/iclick-18.2019.61 ID - Supriyadi2019/07 ER -