Interaction of Pavement and Soil When Pillar Abutment was Excavated
Authors
Guodong Zheng, Enpin Hou, Dengyuan Zhu
Corresponding Author
Guodong Zheng
Available Online July 2015.
- DOI
- 10.2991/icismme-15.2015.115How to use a DOI?
- Keywords
- Stability; sleeve-valve-pipe grouting; bolt support; excavation sequence
- Abstract
The proper excavation sequence of comprehensive strengthening remolded soil method of combining sleeve-valve-pipe grouting and bolt support was studied for the abutment backfill stability problems when the retaining wall in front of pillar abutment was excavated which was often encountered in the construction process of highway reconstruction and extension. With ANSYS software, the strength reduction method was used to analyze the safety factor of slope excavation of different excavation programs to determine the most rational excavation program.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Guodong Zheng AU - Enpin Hou AU - Dengyuan Zhu PY - 2015/07 DA - 2015/07 TI - Interaction of Pavement and Soil When Pillar Abutment was Excavated BT - Proceedings of the First International Conference on Information Sciences, Machinery, Materials and Energy PB - Atlantis Press SP - 561 EP - 565 SN - 1951-6851 UR - https://doi.org/10.2991/icismme-15.2015.115 DO - 10.2991/icismme-15.2015.115 ID - Zheng2015/07 ER -