Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials

Scheduling design flow of armored vehicle with Tabu search

Authors
Jianjun Lin, Dong Yu, Lu Jia
Corresponding Author
Jianjun Lin
Available Online July 2015.
DOI
10.2991/icimm-15.2015.291How to use a DOI?
Keywords
Tabu search; knowledge engineering platform; German Leopard.
Abstract

We deal with resource constrained project scheduling problems (RCPSP for short) in this study, whose aim is to build knowledge platform framework for enterprise. We take the transmission design of German leopard 2 tanks as an example, construct a classic RCPSP design example, and then apply the tabu search to address this issue. The experimental results verified the effectiveness of the proposed tabu search.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials
Series
Advances in Engineering Research
Publication Date
July 2015
ISBN
978-94-62520-88-2
ISSN
2352-5401
DOI
10.2991/icimm-15.2015.291How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jianjun Lin
AU  - Dong Yu
AU  - Lu Jia
PY  - 2015/07
DA  - 2015/07
TI  - Scheduling design flow of armored vehicle with Tabu search
BT  - Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials
PB  - Atlantis Press
SP  - 1579
EP  - 1582
SN  - 2352-5401
UR  - https://doi.org/10.2991/icimm-15.2015.291
DO  - 10.2991/icimm-15.2015.291
ID  - Lin2015/07
ER  -