Scheduling design flow of armored vehicle with Tabu search
Authors
Jianjun Lin, Dong Yu, Lu Jia
Corresponding Author
Jianjun Lin
Available Online July 2015.
- DOI
- 10.2991/icimm-15.2015.291How to use a DOI?
- Keywords
- Tabu search; knowledge engineering platform; German Leopard.
- Abstract
We deal with resource constrained project scheduling problems (RCPSP for short) in this study, whose aim is to build knowledge platform framework for enterprise. We take the transmission design of German leopard 2 tanks as an example, construct a classic RCPSP design example, and then apply the tabu search to address this issue. The experimental results verified the effectiveness of the proposed tabu search.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jianjun Lin AU - Dong Yu AU - Lu Jia PY - 2015/07 DA - 2015/07 TI - Scheduling design flow of armored vehicle with Tabu search BT - Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials PB - Atlantis Press SP - 1579 EP - 1582 SN - 2352-5401 UR - https://doi.org/10.2991/icimm-15.2015.291 DO - 10.2991/icimm-15.2015.291 ID - Lin2015/07 ER -