The Timing of High-speed Railway Construction Based on Demand Power Source
Authors
Panpan Du
Corresponding Author
Panpan Du
Available Online April 2017.
- DOI
- 10.2991/icfied-17.2017.14How to use a DOI?
- Keywords
- High-speed railway; Transportation demands; Time value; Construction time
- Abstract
Historically, the generation and development of transport has a great relationship with its actual demands. In this paper, the causes of high-speed railway production and development in China are discussed from four aspects: passenger demand, enterprise development demand, social sustainable development demand and national strategic demand from the perspective of demand power source, using macroeconomic analysis method. In conclusion, we think the emergence and development of high-speed railway in China is to adapt to the practical demands, and its rapid development has certain inevitability and necessity.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Panpan Du PY - 2017/04 DA - 2017/04 TI - The Timing of High-speed Railway Construction Based on Demand Power Source BT - Proceedings of the 2017 2nd International Conference on Financial Innovation and Economic Development (ICFIED 2017) PB - Atlantis Press SP - 76 EP - 81 SN - 2352-5428 UR - https://doi.org/10.2991/icfied-17.2017.14 DO - 10.2991/icfied-17.2017.14 ID - Du2017/04 ER -