Research on Inspection Scheduling Optimization Model Based on Different Inspection Periods
- DOI
- 10.2991/icesem-18.2018.136How to use a DOI?
- Keywords
- Floyd algorithm; Scheduling model; Inspection route; Optimization
- Abstract
Scheduling problem serves as a common problem both for production and daily life, and the scheduling system has been increasingly emphasized and widely applied with the help of information technology. In this paper, the inspection network of a chemical plant is abstracted as an undirected graph, and the shortest walk time between any inspection points is obtained by means of the Floyd algorithm based on graph theory. Moreover, based on the principle of humanized scheduling, the effective inspection work is defined, and a mathematical model is established and solved by combining the relative balance of the workload and minimizing the staff, and a better scheduling effect is realized.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Linjing Yan AU - Nan Wang PY - 2018/08 DA - 2018/08 TI - Research on Inspection Scheduling Optimization Model Based on Different Inspection Periods BT - Proceedings of the 2018 2nd International Conference on Education Science and Economic Management (ICESEM 2018) PB - Atlantis Press SP - 591 EP - 595 SN - 2352-5398 UR - https://doi.org/10.2991/icesem-18.2018.136 DO - 10.2991/icesem-18.2018.136 ID - Yan2018/08 ER -