A study on Influence of CCPM+ Parameters on Project Scheduling
Authors
Fan Zhang
Corresponding Author
Fan Zhang
Available Online April 2016.
- DOI
- 10.2991/icemct-16.2016.186How to use a DOI?
- Keywords
- buffer sizing; CCPM+; project scheduling
- Abstract
To tackle problems in traditional project system, CCPM (Critical Chain Project Management) was introduced by Goldratt(1997) to identify both task dependence and resource conflicts as main constraints within a project[1]. In this paper, Critical Chain software CCPM+ is utilized to automate the Critical Chain planning process on an example project, from which more in-depth discussions are made based on computerized simulation process by CCPM+. It includes the investigation on the influence of different parameter values on project duration and buffer sizing.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Fan Zhang PY - 2016/04 DA - 2016/04 TI - A study on Influence of CCPM+ Parameters on Project Scheduling BT - Proceedings of the 2016 International Conference on Education, Management and Computing Technology (ICEMCT-16) PB - Atlantis Press SP - 858 EP - 860 SN - 2352-5398 UR - https://doi.org/10.2991/icemct-16.2016.186 DO - 10.2991/icemct-16.2016.186 ID - Zhang2016/04 ER -