Research on Cost Control of Fixed Assets’ Overhaul
Authors
Yiyu Wang
Corresponding Author
Yiyu Wang
Available Online November 2018.
- DOI
- 10.2991/icemaess-18.2018.148How to use a DOI?
- Keywords
- Cost quota, General overhaul, Electric power enterprises
- Abstract
This paper, aimed at the problem of electric power enterprises, will describe the way of making the activity-based cost quota of the fixed assets’ general overhaul, propose suggestions to optimize and update the overhaul cost quota and illustrate the advantages of putting it into practice, so that they can be in an invincible position in the increasingly fierce market competition. The specific contents will be presented in the paper one by one.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Yiyu Wang PY - 2018/11 DA - 2018/11 TI - Research on Cost Control of Fixed Assets’ Overhaul BT - Proceedings of the 2018 5th International Conference on Education, Management, Arts, Economics and Social Science (ICEMAESS 2018) PB - Atlantis Press SP - 744 EP - 747 SN - 2352-5398 UR - https://doi.org/10.2991/icemaess-18.2018.148 DO - 10.2991/icemaess-18.2018.148 ID - Wang2018/11 ER -