COCOMO II Based Project Cost Estimation and Control
Authors
AiHua Ren, Yun Chen
Corresponding Author
AiHua Ren
Available Online December 2015.
- DOI
- 10.2991/icemaess-15.2016.265How to use a DOI?
- Keywords
- COCOMO II; process performance model; software cost control; cost estimation
- Abstract
COCOMO II is a constructive cost model that is widely used in the world. With function points or source lines of code and adjustment factors as input, it can predict software cost. Software process performance model is mainly used to indicate the relationship between the attributes and product in the software development process. Based on COCOMO II and process performance model theory, the viability that COCOMO II serves as a software process performance model is introduced in this paper. Controllable factors, the way to adjust them and benefits we can get are proposed.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - AiHua Ren AU - Yun Chen PY - 2015/12 DA - 2015/12 TI - COCOMO II Based Project Cost Estimation and Control BT - Proceedings of the 2015 3rd International Conference on Education, Management, Arts, Economics and Social Science PB - Atlantis Press SP - 1293 EP - 1299 SN - 2352-5398 UR - https://doi.org/10.2991/icemaess-15.2016.265 DO - 10.2991/icemaess-15.2016.265 ID - Ren2015/12 ER -