3D Model of A Retaining Structure and A Construction Schedule Based on BIM
- DOI
- 10.2991/iceesd-18.2018.83How to use a DOI?
- Keywords
- Retaining Structure BIM Technology 3D Model Construction Schedule
- Abstract
The popularization of subway systems in large and medium-sized cities in China has increased the requirements for the quality and schedule of subway tunnels and stations. The construction of a subway station is a complicated process that considers cost, schedule, quality, and safety. Revit software was used to establish a 3D visualization model of the retaining structure of a subway station, while the subway station in Navisworks software into the retaining structure of the 3D model, and the TimeLiner module in the software simulation of the construction schedule and its plan. The simulated construction schedule was compared with the actual construction schedule, and result served as a guide for constructing the retaining structure.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jin Lu AU - Xiaofan Liao PY - 2018/05 DA - 2018/05 TI - 3D Model of A Retaining Structure and A Construction Schedule Based on BIM BT - Proceedings of the 2018 7th International Conference on Energy, Environment and Sustainable Development (ICEESD 2018) PB - Atlantis Press SP - 464 EP - 467 SN - 2352-5401 UR - https://doi.org/10.2991/iceesd-18.2018.83 DO - 10.2991/iceesd-18.2018.83 ID - Lu2018/05 ER -