Study on the Reasonable Length of Core Soil in Shallow Buried Large Section Tunnel
- DOI
- 10.2991/iceesd-17.2017.37How to use a DOI?
- Keywords
- shallow flat tunnel; super section; double side slope method; excavation rational length
- Abstract
Taking Chongqing Metro Line 5 tunnel project as an engineering example, which is a shallow buried large section tunnel. Study on the length of core soil in the tunnel excavation. The numerical simulation software MIDAS-GTS was used to establish the three dimensional solid model which under different length of core soil. The results were compared with the measured data, and the correctness and effectiveness of the proposed method were verified. The mechanical properties and deformation index of surrounding rock under three different length of core soil were integrated analysis. Finally, the reasonable length of middle wall core soil was determined to be 25 m. The methods and conclusions of this paper can be used as reference for the study of the reasonable length of the middle wall core soil in the flat super large section tunnel. It provided a theoretical support for the construction.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Xingliang Jin AU - Bin Liang PY - 2017/04 DA - 2017/04 TI - Study on the Reasonable Length of Core Soil in Shallow Buried Large Section Tunnel BT - Proceedings of the 2017 6th International Conference on Energy, Environment and Sustainable Development (ICEESD 2017) PB - Atlantis Press SP - 193 EP - 196 SN - 2352-5401 UR - https://doi.org/10.2991/iceesd-17.2017.37 DO - 10.2991/iceesd-17.2017.37 ID - Jin2017/04 ER -