Construction Control Technology of Cast-in-place Foot Section on Arch Aqueduct Using Cantilever Erection Method
Authors
Wenping Peng, Zhongchu Tian
Corresponding Author
Wenping Peng
Available Online September 2018.
- DOI
- 10.2991/iceep-18.2018.172How to use a DOI?
- Keywords
- Arch aqueduct; Prefabrication and lifting; Construction control; Construction joint.
- Abstract
Longchang Aqueduct is a reinforced concrete box deck type arch with clear span 200m,located in Guizhou Province of China, inclined cable-stayed buckle and cantilever erection is adopted for rib assemble. This paper introduces the arch ring of arch foot section of the construction of a unique process, the Reverse tension Bailey truss method, based on two different casting scheme comparisons, the key of the construction control parameters of the technology is put forward. It is of guiding function for engineering practice.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wenping Peng AU - Zhongchu Tian PY - 2018/09 DA - 2018/09 TI - Construction Control Technology of Cast-in-place Foot Section on Arch Aqueduct Using Cantilever Erection Method BT - Proceedings of the 2018 7th International Conference on Energy and Environmental Protection (ICEEP 2018) PB - Atlantis Press SP - 975 EP - 979 SN - 2352-5401 UR - https://doi.org/10.2991/iceep-18.2018.172 DO - 10.2991/iceep-18.2018.172 ID - Peng2018/09 ER -