A Study on Comprehensive Analysis and Control of Cost and Progress of Architectural Decoration Engineering from the Angle of Earned Value
- DOI
- 10.2991/iceemr-17.2017.44How to use a DOI?
- Keywords
- WBS, Earned Value, dynamic control program, decoration engineering
- Abstract
On the basis of introduction of the fundamental principles of Earned Value Management and relevant parameters and evaluation indicators, this paper illustrates features of decoration engineering, and aims to discuss the dynamic analysis of cost and progress of decoration engineering with the adoption of Earned Value and further verifies the analysis by means of engineering examples and tables and diagrams. It is suggested that Earned Value Method is an effective way of measuring and controlling cost and pace in engineering project and it also can be applied into real-time analysis of cost and progress of decoration engineering and correction of adverse factors to ensure that the prospective engineering management can be achieved. Accordingly, Earned Value is an advanced technical tool for project management and it qualitatively and quantificationally analyzes the cost and progress of engineering management according to parameters, indices and curve graphs.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Baoping Chen AU - Yang Song PY - 2017/05 DA - 2017/05 TI - A Study on Comprehensive Analysis and Control of Cost and Progress of Architectural Decoration Engineering from the Angle of Earned Value BT - Proceedings of the 2017 International Conference on Education, Economics and Management Research (ICEEMR 2017) PB - Atlantis Press SP - 171 EP - 174 SN - 2352-5398 UR - https://doi.org/10.2991/iceemr-17.2017.44 DO - 10.2991/iceemr-17.2017.44 ID - Chen2017/05 ER -