Newly Decision-making Model of Power Trading Scheme based on Grid Complex Constraints and Power Plants Individual Differences
- DOI
- 10.2991/iceeecs-16.2016.106How to use a DOI?
- Keywords
- power purchase planning; optimization decision-making model; power network constraints; referential progress
- Abstract
Power purchase planning is one of the important part of production and operation planning of State Grid. This paper builds an optimization decision-making model of power purchase planning based on grid complex constraints, which can achieve the optimal decision-making of annually and monthly rolling trade planning, can meticulously take all kinds of constraints of power system operation into consideration and consider the relationship between generation schedule and external conditions, such as power network restrictions and deliverability of primary energy. Meanwhile, four types of referential progress are introduced. These four progress adequately consider the unit maintenance, load demand and the preference of progress equilibrium of decision-makers. Then, the newly decision-making model of trade planning based on grid complex constraints and referential progress is built.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jianrong Gong AU - Guoning Gao AU - Junli Wu AU - Weijing Zhang AU - Si Chen PY - 2016/12 DA - 2016/12 TI - Newly Decision-making Model of Power Trading Scheme based on Grid Complex Constraints and Power Plants Individual Differences BT - Proceedings of the 2016 4th International Conference on Electrical & Electronics Engineering and Computer Science (ICEEECS 2016) PB - Atlantis Press SP - 521 EP - 528 SN - 2352-538X UR - https://doi.org/10.2991/iceeecs-16.2016.106 DO - 10.2991/iceeecs-16.2016.106 ID - Gong2016/12 ER -