Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation
- DOI
- 10.2991/iccte-17.2017.101How to use a DOI?
- Keywords
- Container terminal; Loading operation; Yard Crane; Yard Truck; Integrated scheduling optimization
- Abstract
To further decrease turnaround time of container vessels, synchronous operation of Quay Cranes (QCs), Yard Cranes (YCs) and Yard Truck (YTs) is mainly considered in multiple work lines condition and an integrated scheduling optimization model of YC and YT, aiming at minimize the makespan of loading operation, is proposed with the consideration of practical constrains. According to complexity of the mathematical model, the multi-layers genetic algorithm (MLGA) is introduced to allocate the tasks of QCs and YCs and FCFS rule is used to dispatch YTs. Additionally, a YC dynamic scheduling strategy is proposed to further improve the solving efficiency of MLGA. In the end, effectiveness of the model and algorithm is certified by making numerical experiments.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Pengliang Cao AU - Guiyan Jiang AU - Hongran Zhao PY - 2017/07 DA - 2017/07 TI - Integrated Scheduling Optimization of Yard Crane and Yard Truck in Ship-loading Operation BT - Proceedings of the 2017 2nd International Conference on Civil, Transportation and Environmental Engineering (ICCTE 2017) PB - Atlantis Press SP - 568 EP - 573 SN - 2352-5401 UR - https://doi.org/10.2991/iccte-17.2017.101 DO - 10.2991/iccte-17.2017.101 ID - Cao2017/07 ER -