A Method for Optimizing Train Diagram of High-speed Railway with Soft Time-window
Authors
Wei Zeng, Xingchen Zhang, Xinmiao Zhao
Corresponding Author
Wei Zeng
Available Online January 2016.
- DOI
- 10.2991/iccte-16.2016.78How to use a DOI?
- Keywords
- High-speed railway; Soft time-window; Conflict resolution; Simulated annealing algorithm
- Abstract
This paper studies optimization of train diagram with different speed of high-speed railways, and introduces soft time window to construct the optimization model of train diagram, aiming at minimizing the difference between the arrival and departure time of the trains and the expectation of passengers with the constraints of reasonable overtakes. A global optimization heuristic algorithm is designed with the combination of strategies on conflict resolution of the lines and simulated annealing, and the case study proves the effectiveness of the optimization method and shows the convergence of the algorithm.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wei Zeng AU - Xingchen Zhang AU - Xinmiao Zhao PY - 2016/01 DA - 2016/01 TI - A Method for Optimizing Train Diagram of High-speed Railway with Soft Time-window BT - Proceedings of the 2016 International Conference on Civil, Transportation and Environment PB - Atlantis Press SP - 466 EP - 471 SN - 2352-5401 UR - https://doi.org/10.2991/iccte-16.2016.78 DO - 10.2991/iccte-16.2016.78 ID - Zeng2016/01 ER -