Study on Commissioning and Operating Scheme of Plasma Ignition System for Supercritical Units of Thermal Power Plant
Authors
Ruopu Yang
Corresponding Author
Ruopu Yang
Available Online February 2016.
- DOI
- 10.2991/iccsae-15.2016.121How to use a DOI?
- Keywords
- supercritical; plasma ignition system; commissioning and operating scheme; outage scheme
- Abstract
For the common existing problems of plasma ignition system of coal-fired boiler like burner coking, cathode heads working shortly and etc., the paper introduces the commissioning and operating scheme for the plasma ignition system of supercritical coal-fired boiler in detail, which would be used for reference to the similar problems.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Ruopu Yang PY - 2016/02 DA - 2016/02 TI - Study on Commissioning and Operating Scheme of Plasma Ignition System for Supercritical Units of Thermal Power Plant BT - Proceedings of the 2015 5th International Conference on Computer Sciences and Automation Engineering PB - Atlantis Press SP - 649 EP - 654 SN - 2352-538X UR - https://doi.org/10.2991/iccsae-15.2016.121 DO - 10.2991/iccsae-15.2016.121 ID - Yang2016/02 ER -