Research on Optimization Strategy of New Energy Grid Scheduling
- DOI
- 10.2991/iccia-17.2017.49How to use a DOI?
- Keywords
- new energy, grid-connected, scheduling system.
- Abstract
In recent years, the development and construction of new energy in China has gradually increased. The generating capacity of solar energy, wind energy etc. new energy power generation has increased year by year. A large number of parallel operation of new energy become the power grid dispatching automation system to face a new challenge. Now mostly power grid dispatching automation system can only monitor the working status of new energy booster station and difficult to effectively control. With the increasing of new energy scale, its interconnection control has become an important problemin power system. Starting from the functions of dispatching automation system, some system control functions of the system were discussed and analyzed.
- Copyright
- © 2017, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Feihong Wu AU - Gengyin Li AU - Yao Wang AU - Chen Zhao PY - 2016/07 DA - 2016/07 TI - Research on Optimization Strategy of New Energy Grid Scheduling BT - Proceedings of the 2nd International Conference on Computer Engineering, Information Science & Application Technology (ICCIA 2017) PB - Atlantis Press SP - 294 EP - 297 SN - 2352-538X UR - https://doi.org/10.2991/iccia-17.2017.49 DO - 10.2991/iccia-17.2017.49 ID - Wu2016/07 ER -