Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015

Analysis on Operational Cost of Modern Tram

Authors
Xinmiao Zhao, Quanxin Sun, Lu Liu, Yong Ding, Ruijia Shi
Corresponding Author
Xinmiao Zhao
Available Online November 2015.
DOI
10.2991/iccet-15.2015.289How to use a DOI?
Keywords
urban rail transit; modern tram; operational cost; sensitivity analysis
Abstract

Operational cost of modern tram consists of the wage, maintenance cost, power consumption cost, management cost and other cost. This paper subdivided the influential factors of traction energy consumption and maintenance cost according to fixed cost and variable cost, and a method is proposed to analyze operational cost. Taking a tramline for example, the sensitivity of passenger volume and the frequency are analyzed. Results show that a double increase of ridership rarely raises annual operational cost by 5.1% while sharply reduces operational cost per capita by 47.5%; an additional 100% increase of the frequency raises the operational cost by 22.7% while reduces operational cost per capita by 38.6%. Consequently, this paper recommends increasing the frequency to enhance competitiveness of modern tram in case of large passenger flow volume, and vice versa.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015
Series
Advances in Engineering Research
Publication Date
November 2015
ISBN
978-94-6252-134-6
ISSN
2352-5401
DOI
10.2991/iccet-15.2015.289How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Xinmiao Zhao
AU  - Quanxin Sun
AU  - Lu Liu
AU  - Yong Ding
AU  - Ruijia Shi
PY  - 2015/11
DA  - 2015/11
TI  - Analysis on Operational Cost of Modern Tram
BT  - Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015
PB  - Atlantis Press
SP  - 1552
EP  - 1557
SN  - 2352-5401
UR  - https://doi.org/10.2991/iccet-15.2015.289
DO  - 10.2991/iccet-15.2015.289
ID  - Zhao2015/11
ER  -