Analysis and design of the tower pier anchor of steel tower cable stayed bridge
Authors
Dong-Li Sun, Bin Xie, Xu Kai Liu, Jing Cao
Corresponding Author
Dong-Li Sun
Available Online November 2015.
- DOI
- 10.2991/iccet-15.2015.219How to use a DOI?
- Keywords
- Bridge engineering, Cable stayed bridge, Tower pier anchor, Entity analysis.
- Abstract
The No.4 bridge of Erdos Wulanmulun River city is a steel-concrete composite beam of cable stayed bridge. The Twin Towers bridge with double cable planes, tower adopts steel bridge tower. This paper introduces the design of structural steel pylon pier anchor and computational analysis of the situation. This research achievement can provide us with a reliable reference for similar projects.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Dong-Li Sun AU - Bin Xie AU - Xu Kai Liu AU - Jing Cao PY - 2015/11 DA - 2015/11 TI - Analysis and design of the tower pier anchor of steel tower cable stayed bridge BT - Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015 PB - Atlantis Press SP - 1171 EP - 1175 SN - 2352-5401 UR - https://doi.org/10.2991/iccet-15.2015.219 DO - 10.2991/iccet-15.2015.219 ID - Sun2015/11 ER -